BUYING GUIDE

What a packaging quotation includes

A box quoted FOB and the same box quoted DDP are not two prices for one thing. The gap is freight, insurance, duty and the cost of being the importer — and leaving it out is how a cheaper quotation becomes the more expensive order.

Four terms, one sentence each

EXW means the goods are yours at our door. FOB means we clear them for export and put them on board the vessel at the named port. CIF means we also pay the ocean freight and a minimum insurance to the named destination port — but the risk still passes at origin, which is the part buyers miss. DDP means we deliver to your named place with duty paid.

The terms are defined by Incoterms 2020, and every one of them needs a named place to mean anything. "DDP" without a city is not a term, it is an intention.

The line that surprises buyers: CIF risk passes at origin

Under CIF the seller pays the freight, but the goods are at the buyer’s risk from the moment they are on board. If the container is lost, the claim runs against an insurance policy the buyer may not hold and cannot easily use. That is why CIF is a price term and not a delivery promise.

DDP is the mirror image. Risk and cost both pass at destination, which is convenient and is priced accordingly: the seller carries the duty, the customs entry and the working capital until the goods arrive. A DDP price is not the FOB price plus freight, and a buyer who assumes it should be is comparing the wrong two numbers.

Import VAT is the number a business should not pay twice

Duty is a real cost and it is not recoverable. Import VAT usually is, if the buyer is the importer of record and is VAT-registered in the destination country — it is reclaimed on the return, but it still has to be funded at the border. On a DDP shipment the seller is the importer of record, pays the VAT, and prices it in.

That is why a DDP quote can look expensive to a VAT-registered brand that would have reclaimed the same tax. For a brand with a fiscal representative and a customs broker, FOB or DAP with the buyer importing is often the cheaper structure; for a small brand with no importer entity, DDP is the only route that does not end with the parcel held at customs.

Building a landed cost

A landed cost is the FOB price plus everything between the port and your shelf. Add freight, insurance, duty, import VAT, destination charges and any inspection, then divide by the units that actually arrive — not by the units ordered.

The worked example below uses round numbers to show the shape of it, not a quotation: 2,000 boxes at US$0.80 FOB is US$1,600 of goods, and the delivered cost is closer to US$1.25 a box. The goods are 64% of the landed cost, which is the ratio most buyers underestimate on a low-value, high-volume item.

LineExampleWho quotes it
Goods, FOBUS$1,600 (2,000 × 0.80)Supplier
Ocean freight, LCLUS$420Forwarder
InsuranceUS$18Forwarder
Duty at 4%US$64Broker, by HS code
Import VAT at 20%US$420, usually recoverableBroker
Destination chargesUS$95Forwarder
Pre-shipment inspectionUS$300Inspection company
Landed, excluding recoverable VATUS$2,497 → US$1.25 a box—

Packaging has a volume problem before it has a weight problem

Freight is charged on the greater of gross weight and volume weight. For air that is cubic centimetres divided by 6,000; for sea LCL it is cubic metres, often with a minimum of one. Boxes are light, so almost every packaging shipment is charged on volume.

This is where the structure becomes a freight decision. A 240 × 240 × 90 mm rigid box shipping assembled occupies 5.2 litres; the same box flat occupies about 1.0 litre. Five times the container for the same number of boxes is the argument for a collapsible structure, and it is worth doing the arithmetic before the structure is fixed rather than after the first freight invoice.

Comparing two quotations across terms

Put both quotes on the same term and the same quantity before comparing anything. A DDP quote at 1,000 pieces against an FOB quote at 5,000 is not a comparison, and the per-unit number that comes out of it is meaningless in both directions.

Then ask for the freight as a separate line. A supplier who will not break it out is either marking it up or has not costed it, and either way the buyer cannot see what changes when the volume doubles. Finally, put the term and the named place in the purchase order. It is the one line that decides who pays for a delay at the port.

What each term includes

TermWe payRisk passesYou still pay
EXWMaking the goodsAt our factoryLoading, export, freight, duty
FOBExport clearance and loadingOn board, at originFreight, insurance, duty
CIFExport and ocean freightOn board, at originUnloading, duty, onward transport
DDPEverything to your door, duty paidAt your named placeNothing, unless you import

Questions about terms and landed cost

Is a DDP price always the most expensive?

It is the most inclusive, not always the most expensive per delivered box. For a brand without a customs entity it is usually cheaper than arranging import itself; for a VAT-registered brand with a broker it can cost more than DAP, because the seller prices in VAT the buyer would have reclaimed.

Which term should I ask for?

Ask for the term you can actually operate. If you have an importer of record and a broker, FOB or DAP. If you do not, DDP. Ask for the same quantity on both terms so the difference is freight and duty rather than a different order.

Who decides the HS code?

The importer is legally responsible for the code declared, whoever prepares the paperwork. Printed and rigid boxes usually sit in a different heading from corrugated cases, and the code decides the duty rate, so it is worth confirming before the first shipment rather than after a reassessment.

Why does freight cost more than the boxes?

It does not per unit at volume, but it can on a small order, because a shipment has a minimum charge and boxes are light. On 500 pieces the freight and fixed charges dominate; on 10,000 they do not. That is the same arithmetic as the minimum order, seen from the freight side.

Can the packaging be shipped flat to cut freight?

Yes, if the structure allows it. A collapsible rigid box ships flat and locks open at packing; a folding carton ships flat by default. On an assembled rigid box the air inside is paid for twice — once in the container and once in the warehouse.

The process described here is audited under⁠ ⁠ ISO 9001,⁠ ⁠certificate 04626Q00932R001, issued by Beijing Head International Certification Co., Ltd.

Delivery terms are read as⁠ ⁠ Incoterms 2020,⁠ ⁠the ICC rules that decide where cost, risk and duty pass from seller to buyer at each named place.

CUSTOM PROJECT

Start Your Custom Packaging Project

Send your product, quantity and the structures you are weighing up. We will tell you which one fits and what it costs.

Request a Custom Packaging Quote
Since 200520+ years manufacturing packaging
two plantsFoshan & Guangzhou
ISO 900104626Q00932R001
AuditedMade-in-China.com · MIC-ASI261850