Why the minimum order is 500 pieces
The minimum is not arbitrary. It is the quantity at which the fixed costs stop dominating the unit price.
What the fixed costs are
Every custom structure needs a dieline, a printing setup and a make-ready on the machine. Those costs are the same whether you run 100 boxes or 10,000, so at a low quantity they dominate the unit price.
At 500 pieces those fixed costs are spread far enough to make the unit price meaningful. Below that, the price per box rises sharply — not because the boxes cost more, but because the setup is divided among fewer of them.
When the minimum moves
Simpler structures can go below 500. Multi-piece sets and complex inserts can need more. The minimum on the quotation is the one that applies to your structure, and it is stated there rather than assumed.
If a quantity is not economical, we say so. A quote that hides a small-run penalty in a low unit price is not a quote you can plan around.
Which structures can run below 500
The 500-piece floor is a typical starting point for a standard custom structure, not a rule that applies to every job — rigid, magnetic, two-piece, drawer, folding carton, corrugated, cylinder and the application ranges (perfume, cosmetic, gift) are all quoted from there, but stock sizes, simpler single-piece builds and reorders can run lower, while a multi-piece set with a tooled insert usually needs more. The figure comes from tooling and setup rather than the box: those costs are spread across the run, so a smaller quantity carries more of them per unit. Your written quotation states the minimum that applies.
A run can dip below that floor through three routes, and each is confirmed on the quotation rather than assumed:
Stock format — a cylinder on a stock diameter, or a carton in a stock size, reuses existing tooling. This is the one case the site states plainly: cylinder boxes on stock diameters can run below 500.
Simplest single-piece build — folding cartons and corrugated boxes ordered as a plain single-piece build need the least tooling and no hand assembly, so the setup spreads over fewer boxes. Rigid, magnetic, two-piece and drawer boxes are made to spec with dies and hand assembly, so they hold at the floor.
Reorders — a repeat of the same structure and size does not repeat the tooling, so its minimum is usually lower than the first order.
What does not lower the floor: a multi-piece set, a moulded tray or many finishing passes adds components and hand work, so it usually needs 500 or more.
| Route | What it takes | Effect on the minimum |
|---|---|---|
| Stock diameter or stock carton size | Reuse existing tooling | Can run below 500 (cylinder stock diameters confirmed) |
| Simplest single-piece build | Minimal tooling, no hand assembly | May run below 500 |
| Reorder of the same structure and size | Tooling already paid | Usually lower than the first order |
| Multi-piece set, moulded tray or many finishes | Added components and assembly | Often 500 or more |
What 500 pieces actually covers
Five hundred is the quantity at which the fixed costs stop being the story. Below it, the dieline, the plate setup and the make-ready are divided among so few boxes that the unit price stops describing the box and starts describing the setup. The board does not cost more; there is simply less of it to carry the setup.
The material is the part that does not move: a 2.0 mm greyboard wall prices the same per box at 200 pieces as at 2,000, because board is bought by grade and area rather than by the length of the run. What the quantity divides is the setup — which is why a small run can cost three times as much per box while containing exactly the same board.
It is also roughly the point where the run is worth scheduling. A machine that is set up for 200 boxes and a machine set up for 500 take the same time to prepare, and the preparation is where the day goes.
Reorders, and the tooling you already paid for
A reorder of the same structure in the same size does not repeat the tooling, so its minimum is usually lower than the first order. Ask for the reorder minimum with the first quotation rather than discovering it a year later, when the answer decides whether a small top-up order is possible.
What resets the calculation is a change of size or shape. A new length is a new dieline; a new colour is a new print setup. If you expect to grow the range, say so at the quotation stage — a structure chosen for one size can often be adapted rather than replaced.
When a smaller quantity is the right answer
A photo shoot, a trade sample set and a market test are all legitimate reasons to want fifty boxes, and none of them is a production order. For those, the honest route is a simpler structure with less tooling, or a stock box from a different supplier, not a custom run squeezed below its economic floor.
The test is what the boxes are for. If they will be sold, the setup has to be paid by someone; if they will be photographed or tested, a smaller quantity at a higher unit price can still be the cheapest way to learn what you need to know.
| Choice | What it changes | Effect on the minimum |
|---|---|---|
| Simpler structure | Fewer parts, less tooling | A lower minimum may be possible |
| One structure across SKUs | Tooling spread over the range | Better price at the same quantity |
| Fewer finishes | Fewer passes to set up | Lower setup, not a lower minimum |
| Stock board and wrap | No special-order material | Shorter lead time, fewer exceptions |
| Larger quantity | Setup spread further | Lower unit price, more stock to hold |
When quantity stops being the deciding variable
Quantity is only one input. Two orders of the same size can carry very different setup when one is a single two-piece box and the other is a multi-piece set with a fitted insert, a second board grade and a separate wrap. Comparing them by piece count alone predicts neither the tooling nor the schedule.
What resets the calculation is a change of structure. A new size is a new dieline, a new colourway is another print setup, and a new component is another make-ready. A range built on one shared structure keeps those one-offs in common; a range built as separate boxes repeats them. Before comparing two quotations at the same quantity, ask which parts of the setup are shared and which are charged again.
| Change between orders | What has to be made again | How to check it on the quotation |
|---|---|---|
| A new size | A new dieline | Ask whether the tooling line repeats |
| A new colourway | Another print setup | Compare the setup lines, not the unit price |
| An added insert or component | Another make-ready and assembly step | Ask what is included in the assembly |
| A second board grade or wrap | A separate material run | Check whether the material line is split |
| The same structure across SKUs | Only the print, if the dieline is shared | Ask which tooling is charged once |
Quantity and what changes
| Quantity | What dominates | Who it suits |
|---|---|---|
| Under 500 | Setup and tooling | A sample or a test, not a launch |
| 500 – 1,000 | Setup plus board | A first order or a limited run |
| 1,000 – 3,000 | Board and print | A launch or a seasonal range |
| 3,000 – 10,000 | Board and finishing | A retail listing |
| Over 10,000 | Board and freight | A mature range |
Questions about minimum order quantity
Can I order fewer than 500?
Sometimes. A stock diameter, a stock size, a simplest single-piece build or a reorder can run below 500, and a sample is a separate thing. The minimum on your quotation is the one that applies.
Why is a small run so expensive per box?
Because the dieline, plate setup and make-ready are fixed costs spread over fewer boxes. The boxes do not cost more; the setup does.
Does the minimum change with the structure?
Yes. A multi-piece set or a complex insert can need more than 500, while a stock diameter, a stock size, a simplest single-piece build or a reorder can run lower. The figure that applies is the one on your written quotation.
Can I mix sizes in one order?
Often, if they share a board and a print setup. Each size needs its own dieline, so the tooling line changes.
Is the minimum the same for a reorder?
Usually lower, because the tooling already exists. Ask for the reorder minimum with the first quotation.
Board thickness is specified to ISO 534, the standard method for the thickness, density and specific volume of paper and board, so a millimetre in a specification means the same thing to both sides.
Start Your Custom Packaging Project
Send your product, quantity and the structures you are weighing up. We will tell you which one fits and what it costs.