SOURCING

China or Europe? The switch, not the price

The unit price difference is the number the decision starts with, and the one that survives least contact with a first year of ordering.

The comparison, and the three terms it leaves out

Two quotations for the same box, one from a plant in Poland and one from a plant in Guangdong. The gap is real, and multiplied by a year of volume it becomes a number large enough to justify a project and a trip. It is also the least reliable of the four terms in the decision, and usually the only one that reaches the spreadsheet.

The other three are the cost of moving, the capital tied up in stock that is at sea, and the cost of a lot that fails at the far end of a five-week lead time. The first is paid once and amortises. The second is a financing question and is recoverable. The third is neither, and it is the one that decides whether the saving was a saving.

Switch cost is nine payments, not one

Moving a box to a new plant is not switching a supplier of tape. The tooling is made again, the artwork has to be fitted to a dieline that is close but not identical, the first production lot is inspected by someone other than the seller, and while that happens two suppliers are holding stock. None of it appears in a unit price, and most of it does not appear on the first quotation either.

Written down, the list usually totals somewhere between one month and one quarter of the annual spend on that structure. That is small enough to dismiss in a meeting and large enough to change the answer, which is exactly why it gets dismissed.

What is paidWhat it isOnce, or every runOn the quotation
Cutting dieSteel rule cut to your dimensions; no two dies are identicalOnce per structureYes, as a separate line
Printing platesOne set per colour, re-made for every run including repeatsEvery runSometimes, inside the print price
Artwork re-fitArtwork re-placed on a new dieline and checked at prepressOnce per designRarely
Sample roundsTwo or three rounds from new tooling, before approvalOnceSometimes, as a sampling fee
First-article inspectionA third party on the first production lotOnceNo
Dual runningStock held from the old supplier while the new lot is approvedOnce, in cashNo
Import setupForwarder account, broker, VAT registration, HS code confirmedOnceNo
Verification visitFlights and days, or a hired auditOnceNo
Internal timeArtwork, compliance file, onboarding, two systems in parallelOnceNo

Two recurring terms that are never in the saving

Boxes are mostly air, so an express rescue is priced on volume and lands at a multiple of the goods value. The ocean is therefore the default, and the transit time becomes a term in the cost rather than a detail of the schedule. Five to seven weeks door to door is stock you own before you need it. The arithmetic is short: weeks of cover, times weekly volume, times landed unit cost. Two thousand a week, six weeks of cover and US$0.80 landed is 12,000 units and US$9,600 of working capital — around US$770 a year to finance, and a write-down if the forecast was wrong.

The second recurring term costs nothing until it happens. A lot that fails inspection at a European plant is replaced in a week. A lot that fails at origin is replaced in five or six weeks, because the replacement makes the same journey the first lot did, and the customer does not wait for either.

Which gives the rule that is uncomfortable to accept and cheap to apply: if a year of saving is smaller than the cost of one failed lot, the move is not a saving. It is a bet that nothing goes wrong, placed at the point where you know least about the new supplier.

The payback, on round numbers

Take 120,000 units a year of one structure, a landed difference of US$0.30 a box, and US$14,000 to move. The saving is US$36,000 a year, the payback is under five months, and the first year still ends ahead by US$22,000. At that volume the case is not close, and nothing that follows is an argument against it.

Halve the volume and the same arithmetic stops being forgiving. At 25,000 units the saving is US$7,500, the same US$14,000 takes twenty-two months to repay, and one failed lot at three per cent of the year erases more than two years of it. The figure that decides is not the unit price. It is volume times the gap, divided by the cost of moving.

On a US$0.30 gap that line sits near 30,000 units a year for a single structure. Halve the gap and the line doubles; double the gap and it halves. Which is why the useful question is not whether China is cheaper, but how wide the gap is on your own box — a narrow gap is usually a sign that the two quotations are not describing the same object.

120,000 a year25,000 a year
Saving per box, landedUS$0.30US$0.30
Annual savingUS$36,000US$7,500
Cost of movingUS$14,000US$14,000
PaybackUnder five monthsTwenty-two months
One failed lot at three per centAbout US$11,000About US$2,300
Failed lots the saving absorbsThree a yearNone

What Europe wins that the price does not show

This is not a list of reasons to stay. It is a list of things that disappear when the production moves, so that the ones that matter to your product can be priced in rather than discovered.

The last two are the ones buyers underweight most. Payment terms are working capital, and a deposit plus a balance at shipment is a different cash profile from thirty days after delivery. A short material chain is worth nothing unless the claim it supports is printed on the pack — but where it is, it is worth a great deal.

AdvantageWhy it survives the price gapWhere it stops mattering
Minimum quantityA few hundred pieces is a normal order, not a favourOnce volume clears the minimum either way
Reprint speedTwo or three weeks, against five to seven weeks landedIf you hold six weeks of cover anyway
Sampling in personYou can stand in the room while the colour is matchedReplaced by a drawdown plus first-article inspection, at a price
A short material chainBoard collected, recycled and printed in one marketOnly if the recycled content claim is printed on the pack
Design rightsEnforceable in your own jurisdictionIf the structure is generic and the design is not the asset
OriginPublic procurement and made-in-EU tender conditionsIf the buyer is a retailer rather than a public body
Payment termsThirty to sixty days, against deposit and balanceIf you have the working capital to carry it

What China wins, beyond the unit price

The part that is not the unit price is the operations. Magnet recessing, wrap folding, ribbon fitting, insert assembly — the stages where labour is the cost, and where the gap between a European wage and a Chinese one is widest. The equipment for foil, emboss, spot UV and opaque screen white is also concentrated in the same few hundred kilometres, so a job needing three of them does not travel between three suppliers.

Board is bought in for the job rather than held in every grade, which turns an unusual wrap into a purchasing line instead of a stock question. And one plant covering structure, print, assembly and insert removes a handoff, which removes one of the places where tolerances accumulate.

None of this is an argument for buying from a supplier who cannot be verified. The five documents are set out in the guide on factory or trading company, and the worksheet for running them is the supplier checklist.

If you move, the order that removes most of the risk

Sample on your own artwork before comparing prices. A sample made from the supplier’s file tests the supplier’s file, not your design, and the two boxes that come back are not the same box.

Make the first order a duplicate rather than a replacement. Run both suppliers for eight weeks: the incumbent is the insurance, and the premium is one overlap of stock, which is the cheapest premium in the whole project.

Put the die in your name before the first order, and ask where it is stored and what it costs to collect. It is the asset that decides whether you can leave again, and it is priced the same whether or not you own it.

Agree the sampling level and the remedy — reprint, credit or replacement — before the purchase order rather than after the failure. A supplier who will not put a remedy in writing has told you what a failure will cost.

And put the delivery term and the named place in the order. A delay at a port is not a supplier problem, it is a term that was never written down.

The decision, by volume

Annual volume, one structureWhat has to be trueWhat we would do
Under 10,000The European price is wrong for another reason: minimum, lead time, or a finish it cannot runStay, and fix the actual problem
10,000 to 30,000Cost of moving below one year of saving, with a supplier already verifiedPilot one reference, keep the rest local
30,000 to 100,000Die in your name, sampling level agreed in writing, eight weeks of dual runningMove in stages, one reference at a time
Over 100,000The margin covers the distance several times overMove, and settle tooling ownership first
Any volume, five referencesNo single plant makes all five wellOne coordinator, with both plants named

Questions about moving production

Is China always cheaper per unit?

At volume, on the same specification, usually yes — the gap is labour and the rate the plant pays for board. On a small order it is often no, because the fixed costs travel with the order and a European plant can put 300 pieces on a press it has already set. A narrow gap is worth reading as a warning rather than as good news: it usually means the two quotations differ in board, wrap or finish rather than in geography.

How long does a switch take?

Eight to twelve weeks, and the factory is not the slow part. Sampling runs 4 – 6 working days from approved artwork, production is 10 working days from the later of receipt of the cleared deposit or written sample approval, and the sea is five to six weeks on top. The clock is the water, which is why the sampling and the die should be settled while the incumbent is still supplying.

Do I have to buy the die?

Ask for it in your name. It is the one asset that decides whether you can leave again, and it costs the same whether or not you own it — so the only thing being negotiated is who keeps it if the relationship ends.

My volume is 20,000 a year. Is it worth moving?

Usually as a pilot rather than as a move. One reference, dual running, a defined review after two lots. At that volume the arithmetic is thin enough that the pilot is the way to find out which way it actually falls, and thin enough that a full move on a promise is a poor bet.

Can I use both suppliers?

Yes, and splitting is often the correct answer rather than a compromise. The low-volume variant stays with the plant that can make 300 without a surcharge; the volume reference moves. What does not work is splitting one reference across two plants, because then no one owns the tolerance.

Who is responsible for compliance when I import?

The importer of record carries the obligation, whatever the origin. A supplier can hold the material data — board grade, recycled content, coating — but the declaration made when the pack is placed on the market is the importer’s, and it has to be assembled from documents rather than from a sentence in an email.

Delivery terms are read as⁠ ⁠ Incoterms 2020,⁠ ⁠the ICC rules that decide where cost, risk and duty pass from seller to buyer at each named place.

CUSTOM PROJECT

Start Your Custom Packaging Project

Send your product, quantity and the structures you are weighing up. We will tell you which one fits and what it costs.

Request a Custom Packaging Quote
Since 200520+ years manufacturing packaging
two plantsFoshan & Guangzhou
ISO 900104626Q00932R001
AuditedMade-in-China.com · MIC-ASI261850