| The scope on the business licence |
The licence, not a screenshot of a certificate of incorporation. |
The scope names manufacture or printing of paper products. The registered address and the plant address are both given, and they are written out rather than implied. |
That this plant will run your job. A licence covers the entity, not the order. |
| The name on the certificate |
The FSC certificate, and the name of the entity that will invoice you. |
The two names match, the scope covers printing or conversion, and the number resolves in the FSC public register. |
That the board is certified. A conversion certificate covers the converting step, not the mill behind it. |
| The address on the audit report |
The third-party audit report, complete, with the page that carries the site address. |
The audited address is the production address. The report has a date, a scope and an issuing body, and all three are legible. |
That the audit examined your structure or your quantity. Most factory audits examine a management system, not a product. |
| Power and permits in the plant name |
A recent electricity bill and the pollutant discharge permit, both in the manufacturing entity name. |
Both name the plant address. A plant that runs presses consumes power at a rate an office does not. |
Capacity for your quantity in your month. A bill proves the machines ran; it does not prove they are free when you need them. |
| A walk-through of one named order |
An unedited two- to three-minute video of a specific order moving through cutting, wrapping and assembly, shot in one take. |
One continuous shot. Machine sound. A die on the bench with your structure on it. The person filming walks from station to station without a cut. |
Quality control. Watching a box being made says nothing about what happens when one comes out wrong. |
| A quotation split into lines |
Board, wrap, print, finishing, insert and tooling, separately, each with a unit and the quantity it is based on. |
Six lines or more, each one arithmetic you can follow. Tooling is named as a one-off rather than folded into the unit price. |
That the price is competitive. A clean quotation is a comparison tool, not a discount. |