BEFORE THE FIRST QUOTE

Six checks before you order from a name on a list.

Most sourcing starts with a list of ten suppliers. A list answers who exists. It does not answer which of them is a factory, whose certificate you are being shown, or which address the boxes will leave from. These are the six checks we would apply to ourselves, each with the limit of what it proves — and a printable version at the end.

A shortlist is not a decision

The names on a shortlist are usually comparable on paper — the same structures, the same finishes, roughly the same range of quantities — because a list is assembled from what each supplier publishes, and every supplier publishes the same verbs. What actually differs between them is not written down anywhere: whether the entity quoting is the entity manufacturing, whether the certificate belongs to the plant or to somebody upstream of it, and whether the address on the paperwork is a building with machines in it.

None of that requires a flight. It requires asking for documents that already exist inside any real factory, and knowing what a real answer looks like when it arrives. The six below are in the order that fails fastest: the first two rule out most of the wrong answers, and the last two are the ones buyers usually skip because they arrive after the price does.

The six checks

Four columns, not three. The last one is what the check does not prove, and it is the column that makes the other three worth reading — a check presented as proof is how a first order goes wrong.

CheckWhat to ask forWhat a real answer looks likeWhat it does not prove
The scope on the business licence The licence, not a screenshot of a certificate of incorporation. The scope names manufacture or printing of paper products. The registered address and the plant address are both given, and they are written out rather than implied. That this plant will run your job. A licence covers the entity, not the order.
The name on the certificate The FSC certificate, and the name of the entity that will invoice you. The two names match, the scope covers printing or conversion, and the number resolves in the FSC public register. That the board is certified. A conversion certificate covers the converting step, not the mill behind it.
The address on the audit report The third-party audit report, complete, with the page that carries the site address. The audited address is the production address. The report has a date, a scope and an issuing body, and all three are legible. That the audit examined your structure or your quantity. Most factory audits examine a management system, not a product.
Power and permits in the plant name A recent electricity bill and the pollutant discharge permit, both in the manufacturing entity name. Both name the plant address. A plant that runs presses consumes power at a rate an office does not. Capacity for your quantity in your month. A bill proves the machines ran; it does not prove they are free when you need them.
A walk-through of one named order An unedited two- to three-minute video of a specific order moving through cutting, wrapping and assembly, shot in one take. One continuous shot. Machine sound. A die on the bench with your structure on it. The person filming walks from station to station without a cut. Quality control. Watching a box being made says nothing about what happens when one comes out wrong.
A quotation split into lines Board, wrap, print, finishing, insert and tooling, separately, each with a unit and the quantity it is based on. Six lines or more, each one arithmetic you can follow. Tooling is named as a one-off rather than folded into the unit price. That the price is competitive. A clean quotation is a comparison tool, not a discount.

Two of these checks can be run without asking the supplier anything: the FSC number resolves in a public register, and the audit report has an issuing body you can contact. Start there if you would rather not announce that you are checking.

Five things that look like evidence

Each of these arrives in a first email and reads like proof. None of them is, and the reason is specific in every case.

"FDA approved" packaging

The FDA does not approve or certify a box. It regulates substances and the migration that comes off them, and the evidence is a declaration and a test report against a named use. A supplier who says the packaging is FDA approved is describing a certificate that does not exist — which tells you something about the other claims. What to ask for instead is on the food contact page.

An ISO certificate with no scope

ISO 9001 certifies a quality management system, and the certificate carries a number, a scope and an issuing body. Without those three it is a logo. Ours is 04626Q00932R001, issued by Beijing Head International Certification Co., Ltd., and the scope printed on it reads “Sales of paper products (paper boxes, paper bags, stickers, cards, packaging paper)”. That is a sales scope rather than a manufacturing one, which is the detail the badge never shows — so ask any supplier what their scope line says before you ask what they are certified to.

A photograph of a machine

A photograph proves a machine exists somewhere. It does not say whose floor it is on, whether it is running, or whether it can hold the tolerance your structure needs. A photo of a die with an order number beside it is a different object, and it is the one worth asking for.

A certificate held by another company

If the certificate holder is not the entity invoicing you, you are looking at your supplier's supplier. That is not automatically a problem — plenty of good trading companies work this way — but it changes what you are buying, and it should be said out loud rather than discovered at the port.

A sample with no production record

A sample proves a sample. The question a sample cannot answer is whether the thousandth unit will be the one you approved, and the only evidence for that is a written specification, an approved golden sample held by both sides, and an inspection plan that references them.

The checklist, on one page

The same ground as above, item by item, in the order a first order reaches it. Print this page and take it to the meeting — the print stylesheet drops the navigation and keeps the table.

CheckedItem
Entity
The legal name on the quotation matches the business licence.
The licence scope names manufacture or printing, not only trade.
The production address is written down, and it is not the sales office.
Certification
The FSC number resolves in the public register.
The FSC certificate holder is the entity that will invoice us.
The FSC scope covers conversion, not trading alone.
The ISO 9001 number and issuing body are both stated.
A third-party audit report names the production address.
Capacity
Monthly capacity is given as a number.
Minimum order quantity and sample lead time are in writing.
The plant names the machines it will run this structure on.
Quality and commercial
AQL level, inspection stage and accept and reject numbers are agreed before production.
A pre-production sample is approved against a written specification, not a photograph.
The quotation is split into board, wrap, print, finishing, insert and tooling.
Tooling ownership, retention period and reorder cost are stated.
Payment terms and the Incoterm are named on the quotation.

Keep the evidence, not the tick. A ticked box with no document behind it is a memory of an email, and the document is what a colleague will ask for in eighteen months when the second order is late.

Apply the same checks to us

A page that only tells you how to test other people is an advertisement with a table in it. So here are our own answers to the list, and the register where two of them can be checked without our involvement.

Manufacturing entityGuangzhou Gooinpack Packaging Co., Ltd.
Operating since2005 — 20+ years
PlantsNanhai, Foshan, and Panyu, Guangzhou — about 3,000 m² together
Office and showroomPanyu District, Guangzhou
Employees150+
Monthly capacity1,500,000 boxes
FSCSGSHK-COC-330019 — Guangzhou Guyin Packing Co., Ltd., issued by SGS Hong Kong Limited, valid to 3 August 2030, scope: purchasing of FSC 100% and FSC Mix pulp, manufacturing (transfer system) and sales of FSC 100% and FSC Mix paper
ISO 900104626Q00932R001, Beijing Head International Certification Co., Ltd.
Third-party auditMIC-ASI261850, Made-in-China.com
Minimum orderTypically from 500 pieces per size and specification, and per diameter and specification for round tubes; confirmed in your written quotation
Sample lead time4 – 6 working days from approved artwork
Production lead time10 working days from the later of receipt of the cleared deposit or written sample approval
Terms quotedEXW, FOB, CIF or DDP

The FSC entry resolves at connect.fsc.org under the certificate number above. The audit report is held by Made-in-China.com and can be requested from them rather than from us, which is the point of a third-party audit. The ISO certificate number is verifiable with Beijing Head International Certification Co., Ltd.. Each of the three is set out on our recognition page with its issuer, its reference and the part of the business it does not cover, along with the business directories we appear in.

Our own FSC scope is worth reading against the second check on the list, because it looks like a failure and is not.

The certificate covers FSC pulp and paper, which is the fibre chain behind the board we buy; it does not cover the conversion of that board into a printed box, so an FSC claim on a finished box is arranged for the job rather than inherited from the certificate. That is the same reading we ask you to apply to us: a scope says what an entity is certified to do, and the scope string is the part a buyer has to read. What we are not doing is claiming a broader scope than the document has.

Two entries are missing from this list on purpose. We do not publish a customer list, and we do not publish other people's projects as references — a reference you cannot call is a logo. If you want to speak to a buyer in your category, ask, and we will ask them first.

Questions about these checks

Why publish a checklist that a buyer could use to rule us out?

Because the checks that rule out a trading company are the same checks that qualify a plant, and the two cannot be separated. A buyer who runs these checks on three suppliers and one of them answers all six has learned more than a week of comparing websites would tell them. If that supplier is not us, the page has still done its job — and the reader now knows what the difference looks like when they meet it.

Is a factory visit better than documents?

A visit is better evidence, and it is also the thing most buyers cannot do before a first order. Documents are what remain when a flight is not on the table — which is why the checks here are document checks, and why each one states what it does not prove. If you can visit, visit, and take this list with you: the same items are what you would ask to see on the floor.

What if a supplier will not send the audit report?

Ask once more, in writing, and say which pages you need. Some plants are protective of a full report because it carries customer names on the site plan, and a redacted copy that keeps the address, the date, the scope and the issuing body is a reasonable compromise. A refusal with no redacted version offered is an answer in itself.

Is a trading company always the wrong answer?

No. A good trading company can hold stock, consolidate several structures, handle export paperwork and take on the risk of a small first order — none of which a plant with a 500-piece minimum is set up to do for a first-time buyer. What matters is that you know which one you are buying from, because it decides who is accountable when a box comes out wrong. The problem is never the model; it is finding out at the port.

How long should all of this take?

About twenty minutes of reading and one email. Everything on the list already exists inside a real factory — the licence, the certificates, the audit report, the bill, the quotation format — so a supplier who has it can answer the same day. A week of silence is not a paperwork problem.

Certified paper is verified through⁠ ⁠ SGSHK-COC-330019,⁠ ⁠our own chain-of-custody certificate for FSC pulp and paper, in the public register.

The process described here is audited under⁠ ⁠ ISO 9001,⁠ ⁠certificate 04626Q00932R001, issued by Beijing Head International Certification Co., Ltd.

CUSTOM PROJECT

Send the product, not the brief.

Product dimensions, weight, quantity and the market it ships to is enough for a first answer. If you already have a drawing, send that instead — it is faster for both of us.

Request a quote
Since 200520+ years manufacturing packaging
two plantsFoshan & Guangzhou
ISO 900104626Q00932R001
AuditedMade-in-China.com · MIC-ASI261850