BUYING GUIDE

What to check during a factory audit

A factory audit is not a tour of the showroom. Six classes of hard evidence — legal entity and certificates, live orders, QC records, material traceability, and the compliance file — and the red flag in each.

Start with what an audit is actually for

An audit is not a test of whether a factory can make one good box. Any plant can make one good box, and most will have one on a shelf in the meeting room. An audit is a test of whether the same box arrives on the second order, the tenth and the one after a busy month, from the same board, on the same die, with the same inspection behind it.

That makes the question consistency rather than capability, and it changes what counts as evidence. A machine list, a certificate folder and a finished sample are all capability. What answers the question is a dated record attached to a named order: what ran, what was checked, what failed and what was done about it. Six classes of evidence cover the ground, and each one has a red flag that a showroom cannot hide.

The six classes of evidence

Work through them in this order, because each one depends on the one before it. A capacity claim is worth little if the legal entity in front of you is not the entity on the contract; a certificate is worth little if the material it covers is not the material in the order.

CheckWhat to look atRed flag
Legal entityBusiness licence and the original certificatesCertificate holder and contract party are different names
CapacityLive orders, the production schedule, the shift boardA showroom and a sample shelf, but nothing running
ProcessWrapping, forming, assembly and finishing stationsKey operations are outsourced and nobody can say where
QCFirst-article, in-process and final-inspection recordsOnly a finished-goods check, with no dated process records
TraceabilityThe batch and the scope string on the certificateCertificate number is valid but the batch sits outside its scope
Labour, fire, wasteAisles, emergency lighting, drill log, waste consignment notesBlocked aisles, no drill record, ink and adhesive drums with no disposal trail

Certificates: the number, the holder and the scope

A certificate is three facts, not one. The number has to be checkable in the issuing body’s public register; the holder has to be the legal entity you are contracting with; and the scope has to cover the material and the activity in your order. A printed copy in a folder proves none of the three on its own, because a printed copy can be a copy of anything.

For FSC chain of custody the register is the FSC public certificate search, and the scope string is the part buyers skip. A certificate whose scope covers pulp and paper covers the paper and the fibre, not the converting of a printed box. On this site we publish SGSHK-COC-330019, our own certificate, and its scope says exactly that: it supports the board we buy, and it does not turn the whole assembly into a certified product.

ISO 9001 is checked the same way, against the certification body and the certificate number, and it says that a quality management system was audited — not that a particular batch passed. The useful question is always the same: name the certificate, name the holder, name the scope, and then ask which of those three can be looked up today.

Capacity is the order book, not the machine list

Ask which orders are running this week, what the delivery schedule says for the next month, and how many shifts the line is on. A plant quoting a monthly figure is quoting a theoretical maximum; a plant that can name three jobs, their quantities and their ship dates is showing you the capacity that is actually left. The second number is the one your order will be fitted into.

Then follow one named order from goods-in to the packed pallet. Not a tour of the building — one order, its paperwork, its board batch and its inspection sheet. If key operations are subcontracted, the answer should be a name and an address, not a shrug. A trading company borrowing a factory for the afternoon is the most common staged audit there is, and it survives a walk-through but not a named order.

QC is three positions and their records

Three positions do the work: first article off the line, in-process checks during the run, and final inspection before the pallet is closed. Each one needs a dated record with the person who signed it and the action taken when something was out of tolerance. A wall plaque is not a record, and a finished-goods check on its own is a sorting exercise rather than a process control.

Ask to see a failure. A factory with no non-conformance notes is either a factory that has never made a mistake or one that is not writing them down, and only the second is plausible. The note tells you more than a clean sheet does: what drifted, who caught it, whether the lot was reworked or scrapped. Where a retailer requires a report rather than a result, third-party inspection is supported, but it is a snapshot of one day and does not replace the records.

Material traceability is where a claim is won or lost

Chain of custody is batch-level, not number-level. A valid certificate number says the holder is certified; it does not say this pallet of paper is inside the scope, in the grade and in the quantity the claim needs. The invoice, the delivery note and the batch reference have to line up with the certificate scope before an on-product claim can be printed.

That is why certified stock is bought against a specific order and quoted separately rather than held on a shelf as a general claim. A supplier who can produce a number but not a batch trail is asking you to take the label on trust. The same discipline applies to board grade, wrap stock and ink: name the material in the purchase order, then check the delivery against it.

Labour, fire and waste close the file

The last three checks are the ones a packaging audit is most tempted to skip, and they are the ones a retailer’s own questionnaire will ask about. Walk the aisles rather than the corridor: blocked egress, unlit emergency lighting and a fire drill with no date are visible in two minutes. Check the drill log rather than the certificate on the wall.

Waste is the quiet one. Ink, adhesive and solvent drums have a disposal trail, and a plant that cannot produce consignment notes for them is a plant with an unresolved compliance gap. None of this proves the box is well made. It proves the operation around the box is being run in a way that will still be there for the second order.

Manufacturing Insight from Metapackink

When buyers audit us, the question that comes up most often is not about the presses. It is: does the FSC certificate cover the paper grade and the quantity in this particular order? The number is valid and the holder is this company — but that is not yet an answer about a batch, because the scope is FSC pulp and paper and the claim on a converted box is arranged for the job rather than inherited from the certificate.

The answer is batch by batch. If the paper for the order is inside the certificate scope, supplied against that order and documented, the claim can be stated for the board. If the batch sits outside the scope, the number still checks out in the register and the claim still cannot be printed. We have had buyers treat the register hit as the end of the question, and it is the beginning of it.

The judgement we took from those audits is that chain of custody is a batch claim, not a certificate claim, which is why certified stock is procured per order and priced as its own line rather than folded into a general promise. It costs one extra line on a quotation. It is also the difference between a claim that survives a retailer questionnaire and one that is withdrawn after the goods have shipped.

What to bring, and what to write down

Bring the six checks as a worksheet with a column for the evidence and a column for who signed it, and fill it in as you walk rather than afterwards. Photograph the schedule board and the inspection sheet with the date visible. Ask for the business licence, the certificate originals and one named order’s paperwork before you leave, not as a follow-up email — a document that arrives later may have been produced later.

Announce the first audit if you like; do not announce the re-audit. A third-party report and your own visit are complementary rather than interchangeable: the report records one day to a standard, and your visit tests whether that day was typical. Write the pass criterion down before the visit so that an audit ends in a decision rather than in a feeling about the place.

What each piece of evidence proves

EvidenceWhat it provesWhat it does not prove
Business licenceThe legal entity you are contracting withThat the entity makes anything at all
Certificate in the public registerThe number is valid and the holder is certifiedThat your batch falls inside the scope
Production scheduleWhat the plant is actually running this weekWhat it could run at full utilisation
Dated inspection recordsThat a process was checked during the runThat the next run will be checked
Batch and delivery noteThat the material in the order is the material claimedThat the finished assembly is certified
Third-party audit reportWhat was true on the day of the auditWhat is true on the day your order runs

Questions about factory audits

Should a first audit be announced?

A first audit can be announced, because you are establishing what documents exist and a prepared plant will show them. A re-audit is better unannounced: the point of a second visit is to see the ordinary state of the floor rather than the version that was tidied for a date. The two answers are different pieces of evidence, and a programme that only ever announces is only ever seeing one of them.

Can a factory without an FSC certificate buy FSC paper?

It can buy the paper, but it cannot put an FSC claim on the box by itself. Printing the claim requires chain-of-custody coverage for the entity that takes ownership and applies the label, either through its own certificate or through the certificate holder’s authorisation with the batch inside that scope. A supplier who offers certified stock without that trail is offering material, not a claim.

Can a third-party audit report replace my own visit?

No. A report is a structured observation of one day against a defined standard, and it is useful precisely because it is independent. Your own visit answers a different question — whether that day was typical, and whether the plant can repeat it on your order. Use the report to know what to look at, then go and look at it.

What is the most common staged audit?

A trading company showing a plant it does not own. The giveaways are consistent: the certificate holder, the business licence and the contract party are different names; utility accounts are not in the plant’s name; and a request to walk one named order end to end produces a tour of the building instead. Ask for one order and its paperwork, and the shape of the relationship usually becomes clear within an hour.

Certified paper is verified through⁠ ⁠ SGSHK-COC-330019,⁠ ⁠our own chain-of-custody certificate for FSC pulp and paper, in the public register.

The process described here is audited under⁠ ⁠ ISO 9001,⁠ ⁠certificate 04626Q00932R001, issued by Beijing Head International Certification Co., Ltd.

CUSTOM PROJECT

Start Your Custom Packaging Project

Send your product, quantity and the structures you are weighing up. We will tell you which one fits and what it costs.

Request a Custom Packaging Quote
Since 200520+ years manufacturing packaging
two plantsFoshan & Guangzhou
ISO 900104626Q00932R001
AuditedMade-in-China.com · MIC-ASI261850